QUICK TIPS Want an economical and easy way to prolong the life of your equipment? Install Tee-Line Strainers at the suction end of the pump to protect the pump, process equipment and valves from foreign materials, such as gasket pieces, bolts, and other items. How should the insert be positioned? The concave side of the insert (or scooped side) should be positioned facing the incoming flow. The insert handle should be positioned perpendicular to the line. Add the Alignment Pin option to "fool proof" the installation of the strainer, and eliminate any possibility of incorrectly positioning the Element. GOOD TO KNOW • Strainer & Element Material: 316Lss • Full Assembly Maximum Pressure Rating (Standard Tri-Clamp): 125 psi (up to 4" body) / 75 psi (6" body) • Full Assembly Maximum Pressure Rating (High Pressure Tri-Clamp): 200 psi • Maximum Temperature Rating: 250 ° F • The open area of perforation exceeds the line size diameter. • The Tee-Line Strainer with alignment pin keeps the insert properly positioned. • Connection size and body size are always equal. • Tuf-Flex ® Gaskets are PTFE gaskets with an EPDM core - they help reduce "stickiness" of the gasket allowing for an easier and quicker strainer element removal process. • Recommended Maximum Flows:
Connection Size
Recommended Max Flow (gpm)
1.5"
55
2.0"
105
2.5"
165
3.0"
240
ITEM NO.
QTY
PART NUMBER DESCRIPTION
4.0"
430
1 2 3 4
1 1 1 1
020904 TEE,TUBE,3.00,316L,TC,#7 740762 INSERT,PERFORATED,316L,BLA LINE,0.25 HOLES 021030 GASKET,3.00,TC,EPDM, 020084 CLAMP,S-LINE,TC,HD,WINGNUT
6.0"
980
Concave side of insert should face incoming flow.
REF 3 3/4" Recommended process line installation positioning.
4
3
2
1
55
HCS-0001.7
REF 3 3/4"
Powered by FlippingBook