TANKO® S & TANKO® RB_IOM_Rev0

ATEX Spate Cleaner TANKO-EX-S and ATEX Spray Cleaner TANKO-EX-RB

5. Check the interfaces on the device for leaks.

6. NOTE Danger of collisions with moving parts!

Observe the following steps if components in the container are required to rotate during the cleaning process:

 Start up the surrounding components (e.g. agitators) step by step.

 Carefully check that the cleaning head and surrounding components (e.g. agitators) do NOT collide while moving simultaneously.

7. Make sure that there are no unusual vibrations.

8. Check the device to make sure that it runs quietly and smoothly.

9. Switch off the device (see section 7.2 Switch-off Procedure ).

6.3 Switch-on procedure

In accordance with the type of device activation and how it is integrated (e.g. manual or automatic) on the cleaning plant, the switch-on procedure must be integrated and the following instructions must be observed when switching on.

WARNING

Risk from sudden, unforeseeable or unauthorized activation of the device (e.g. triggering of a start command as a result of incorrect operation of a start-up control device)! There is a risk of death or severe physical injury. When commissioning the device, it is imperative to perform the following working steps in

the specified order. Switch-on procedure

1. Securely close all of the openings on the container (e.g. inspection openings). 2. Switch on the cleaning agent supply (e.g. slowly open the shut-off valve or ball cock). 3. Check that the supply of cleaning agent is NOT interrupted and the media pressure on the device is established. 4. Take suitable measures to secure the supply of cleaning agent to prevent it from switching off suddenly, unexpectedly or without authorization.

44/79

Translation-Operating/Installation Instructions 2017/10

6 Commissioning

Powered by