TANKO® MX_IOM_Rev0

Jet Cleaner TANKO-MX

CAUTION

Insufficient lighting in the working environment! The device is NOT equipped with its own lighting. Insufficient lighting when working on the device can cause accidents. There is a risk of minor or moderate injury.  Make sure that there is sufficient and even lighting in all areas of the plant in which the devices is used when work is performed on the device.  In Germany, the technical rules for workplaces ASR A3.4 apply. An illumination level of 300 lx (lux) is recommended (maintenance value).

6.2 Functional Check / Trial Run

All the screw connections on the device are firmly tightened in the factory. Nevertheless, a trial run should be carried out to check that the device functions safely and reliably and that it is leak-tight once installed.

Only ever operate the device in perfect condition. The container to be cleaned must be run empty and depressurized.

WARNING Persons in the container! A person may be struck by the jets from the cleaning head. There is a risk of death or severe physical injuries.  DO NOT start cleaning operation while there are persons in the container. 1. Close all of the openings on the container (e.g. inspection openings). 2. Switch off moving parts in the container and secure against being inadvertently switched back on or set in motion. 3. Check that there is a safe distance around the container and the surrounding components. 4. Switch on the device (see section 6.3 Switch-on procedure ). 5. Check the interfaces on the device for leaks. 6. NOTE Danger of collisions with moving parts! If components in the container rotate during the cleaning process, adhere to the following steps:  Start up the surrounding components (e.g. agitators) step by step .  Carefully check that the cleaning head and surrounding components (e.g. agitators) do NOT collide while moving simultaneously. 7. Make sure that there are no unusual vibrations.

8. Check the device to make sure that it runs quietly and smoothly. 9. Switch off the device (see section 7.2 Switch-off procedure).

36 / 86

Translation of the original operating/installation instructions 2016/03

6 Commissioning

Powered by