TANKO® RF_IOM_Rev0

Mini retractor system TANKO-RF

Inspection and maintenance work

A Check screw connection for tightness, tighten if necessary. (For tightening torque, see Table 7.5-1) . B Check screw connection for tightness, tighten if necessary. (For tightening torque, see Table 7.5-1) .

m

V, F

m

V, F

1st and 2nd H500 then H1000 or ¼-j

C Check spring for wear, cracks or breakage, replace if necessary. Replace after 100000 load cycles at the latest.

V, F

D Check clip-on connection for contamination, wear and damage. • In case of wear or damage of the connected parts (pos.2 and 3) replace them. • Replace wire locking pin with original part. E Check plain bearings for wear. Spray head should be easy to rotate. Replace plain bearings if necessary. F The spray slots must be free of deposits and contamination, clean if necessary. G The spray holes must be free of deposits and contamination, clean if necessary. H Check O-ring for wear and tightness, replace if necessary. J Check O-ring for wear and tightness, replace if necessary. K Check the clamp connection for tight fit and impermeability. If necessary, correct clamp or replace seal

200H B

V, F

m, or after h B= 300 m, or after h B= 300 m, or after h B= 300

V, F, R

V, F, C

V, F, C

m m

V, F, R V, F, R

d

V, R

L For clamp PC, check clamp connection for tight fit and impermeability. If necessary, correct clamp or replace seal. d L For screw connection PC, check screw connection for tight fit, tighten if necessary. (For tightening torque, see Table 7.5-1) . d

V, F

V, F

Table 7.4-1: Inspection and Maintenance Work

The presence and legibility of information and warnings must be checked regularly.

7 Maintenance

Operating/Installation instructions 2023/09

63/84

Powered by