SANICAB® PC CABINET WASHER
12.3 Documentation 12.3.1 Functional Specification (FS) The Functional Specification (FS) is a detailed operational specification document and is provided in Sani-Matic’s standard format. 12.3.2 Configuration Specification (CS) The Configuration Specification (CS) is a detailed specification on the control components and software and is provided in Sani- Matic’s standard format. 12.3.3 Factory Acceptance Test (FAT) The Factory Acceptance Test (FAT) includes both the FAT protocol document as well as the on-site FAT execution. The document is provided in Sani-Matic’s standard format. The FAT execution is performed and documented prior to shipment and includes up to four (4) days of on-site owner/user participation. Sani-Matic’s testing facilities include 460V AC, 3PH, 60Hz electrical power, compressed air, plant steam (as required), and low conductivity DI water allowing the system to be tested under design conditions. Testing will include a step-by-step written verification test of all electrical and hardware functions. Additional on-site owner/user time can be purchased if needed. 12.3.4 Site Acceptance Test (SAT) Document The Site Acceptance Test (SAT) document provides a detailed commissioning protocol to assist with the owner/user’s site acceptance testing, including step-by-step written verification testing of all electrical and mechanical hardware
functions, and is provided in Sani-Matic’s standard format. 12.3.5 Installation Qualification / Operation Qualification (IQ/OQ)
The Installation Qualification (IQ) and Operational Qualification (OQ) documents together provide a documented method for verification to ensure the system has been properly installed and that it is operating as designed. The document is provided in Sani-Matic’s standard format.
33
Powered by FlippingBook