3) RECEIVING AND INSPECTION
1. CleanWorx equipment is well packaged upon leaving the factory; however, CleanWorx cannot guarantee the safe arrival of this equipment at your plant. Therefore, immediately upon receipt of the CleanWorx equipment, the unit should be removed from the crate, and any smaller parts should be unpacked. All items should be inspected, and any improprieties noted on the receiving paperwork. Further, an accounting of loose parts is made upon receipt. Confirmation of parts shipped can be found in the packing slip. Any deviations noted during the inspection should be made on the receiving paperwork. 2. If there are any parts missing or if this equipment is damaged, you must file a claim with the carrier. All claims must be filed within 5 days after delivery. The claim is the responsibility of the purchaser, but CleanWorx can assist where possible.
15
Powered by FlippingBook