TANKO® SF_IOM_Rev0

Spate cleaner TANKO-SF

7.4.1 Maintenance Intervals

NOTE

Component failure due to vibration damage! During operation, vibration can cause screw and clamp connections to work loose or the device to be subjected to severe strain, thus possibly leading to component failure. The failure of components or a device malfunction can cause material damage and consequential damages.  Check the installed device for loose connections at regular intervals.  Watch out for vibration damage during maintenance and checking.  Adapt the maintenance intervals according to the operating conditions of the plant. After commissioning, start first with short maintenance intervals. If no damage occurs, the maintenance intervals can be adapted incrementally until the intervals specified in the instructions are reached.

The design of the device requires a low amount of maintenance. An inspection is recommended after each 250 operating hours (h B ) and maintenance no later than after 500 operating hours (h B ).

Inspection

The purpose of the inspection is to determine the orderly condition of the device. An inspection should be carried out as follows:

CAUTION Risk of chemical burns and burns when opening the container!

The supply line is pressurized. The person may be struck by cleaning jets or come into contact with cleaning agent. There may also be hot vapors in the container.

There is a risk of minor or moderate injuries.

 Use only clear water with a maximum temperature of +40 °C (+104 °F) for inspection purposes.

 Before opening the container, observe the cooling and draining time.

 Before opening the container, make sure that the container is NOT pressurized.

 Use personal protective equipment (e.g. protective gloves, safety shoes, safety goggles).

1. Set the water pressure to 0.3 bar (4.35 psi).

2. Open the flap on the container.

3. Check the rotation of the device and the spreading of the liquid at the outlet openings.

4. For maintenance work, remove the device as necessary (see section 7.3 Removal ). Before starting work, observe the working steps of the switch-off procedure (see section 7.2 Switch-off Procedure ).

7 Maintenance

Translation of the original Operating / Installation Instructions 2016/09 Rev.1 41/63