Jet Cleaner TANKO-JM
A Actuator / Energy Supply Media connection [MC] (connection of the downpipe [DP] to the device)
B Device / Container
Process connection [PC] (connection of the downpipe [DP] to the container) C Space for Movement / Installation Space Cleaning head with nozzles (space for orbital nozzle movement and outlet of cleaning agent)
Figure 5.2-4: Interfaces of the JM500 device
5.2.1.3 JM800 Installation Dimensions and Interfaces
300 mm / 12 in
SW 54 mm/ 2 ⅛ in
Ø 345 mm / Ø 13 ½ in
Ø 310 mm / Ø 12 in
Ø 370 mm / Ø 14 ½ in
Front view
Top view
Figure 5.2-5: Installation dimensions of the JM800 device
34/90
Translation of the original Operating / Installation Instructions 2016/12
5 Installation
Powered by FlippingBook