TANKO® JM_IOM_Rev1

Jet Cleaner TANKO-JM

A Actuator / Energy Supply Media connection [MC] ] (connection of the downpipe [DP] to the device)

B Device / Container

Process connection [PC] ] (connection of the downpipe [DP] to the container) C Space for Movement / Installation Space Cleaning head with nozzles (space for orbital nozzle movement and outlet of cleaning agent)

Figure 5.2-6: Interfaces of the JM800 device

5.2.2 Installation Position

1) Aligned vertically with the cleaning head pointing downwards (standard): The device is designed for vertical installation as the preferred position. This installation position means that the device can drain automatically. 2) Different installation position from the standard: A different installation position to the standard position means that the device may NOT always be able to drain automatically. The strain on the bearings is also increased.

Adhere to the following:

– The running performance may be compromised.

– The service life of the bearing elements may be shortened as a result of the increased strain.

– Maintenance intervals should be shortened if necessary (see section 7.4.1 Maintenance Intervals ).

5.2.3 Installing the Device

Installation Opening of the Container

The use of the device (mobile or stationary) is the decisive factor for the required size of the installation opening. The specified installation dimensions in Table 3.3-1: Operating parameters of the device are

5 Installation

Translation of the original Operating / Installation Instructions 2016/12

35/90

Powered by