TANKO® JM_IOM_Rev1

Jet Cleaner TANKO-JM

7.4.1.1 JM100 Maintenance Intervals

Maintenance points

A Media connection [MC] / Process connection [PC]

B Plain bearing on rotor shaft

C Housing / bevel gear wheel connection

D Nozzle carrier / nozzles connection

E Plain bearing on axis for nozzle carrier

Figure 7.4-1: JM100 maintenance points

The tightening torque values for the thread connections required for maintenance are listed in section 7.5.1 JM100 Spare Parts.

Inspection and Maintenance Work

A The fluid and process connection is implemented using a threaded connection. Vibrations from operation could under certain circumstances cause the connection to become loose. You must therefore regularly check to see if they are firmly in place.

m

S, F

B Check plain bearing to make sure it is fully functional and for wear. Clean or replace the plain bearing washers as necessary.

200 h O

S, F, R

C The housing/bevel gear wheel connection is implemented via a threaded connection. Check the secure placement and functionality of the bevel gear wheel (rotation) and the wear on the teeth. m S, F

D Check the nozzle carrier / nozzles connection to make sure that it is securely in place.

m

S, F

E Check the ball bearings to make sure they are fully functional and for wear. Clean or replace the balls as necessary.

200 h O

S, F, R

Table 7.4-1: JM100 inspection and maintenance work

54/90

Translation of the original Operating / Installation Instructions 2016/12

7 Maintenance

Powered by