TANKO® JM_IOM_Rev1

Jet Cleaner TANKO-JM

7.4.1.2 JM500 Maintenance Intervals

Maintenance points

A Media connection [MC] / Process connection [PC]

B Plain bearing on rotor shaft

C Housing / bevel gear wheel connection

D Nozzle carrier / nozzles connection

E Ball bearing on axis for nozzle carrier

D Nozzle carrier / bevel gear connection

Figure 7.4-2: JM500 maintenance points

The tightening torque values for the thread connections required for maintenance are listed in section 7.5.2 JM500 Spare Parts.

Inspection and Maintenance Work

A The fluid and process connection is implemented using a threaded connection. Vibrations from operation could under certain circumstances cause the connection to become loose. You must therefore regularly check to see if they are firmly in place.

m

S, F

B Check plain bearing to make sure it is fully functional and for wear. Clean or replace the plain bearing washers as necessary.

200 h O

S, F, R

C The housing/bevel gear wheel connection is implemented via a threaded connection. Check the secure placement and functionality of the bevel gear wheel (rotation) and the wear on the teeth. m S, F

D Check the nozzle carrier / nozzles connection to make sure that it is securely in place.

m

S, F

E Check the ball bearings to make sure they are fully functional and for wear. Clean or replace the balls as necessary.

200 h O

S, F, R

F A thread is used to connect the bevel gear wheel to the nozzle carrier. Check the secure placement and functionality of the bevel gear wheel (rotation) and the wear on the teeth. m S, F

Table 7.4-2: JM500 inspection and maintenance work

7 Maintenance

Translation of the original Operating / Installation Instructions 2016/12

55/90

Powered by