BPB-0008_TACTaFlow™_Brochure_Rev1.0

Pharma Multi-Tank TACTaFlow D60 Schematic

TACTaFlow S45 / S60 Schematic

Pharma 1-Tank

CE

FE

CE

FE

CIP Return

CIP Return

TE

TE

PW

CIP Supply

WFI

CIP Supply

Drain

WFI

PW

Drain

Steam

Wash/Rinse

Steam

Wash Solution

Rinse

Air

Air

LE

LE

LE

CE PE

FE

TE

CE PE

FE

TE

Supply Pump

Supply Pump

Chemical Supply

Chemical Supply

Drain

Drain

Condensate Return

Condensate Return

Drain

Drain

NOTE: Illustrative P&ID shown above. S45 uses electric heat as a standard. Design may vary based on selected options.

Operating Requirements

U TACTaFlow S60 / D60 ow 4 Description

Requirement

Connection

Water #1 – Purified Water

20 gpm @ ≤ 40 psi, 20 °C - 80 °C 20 gpm @ ≤ 40 psi, 20 °C - 80 °C

1.5" TC 1.5" TC 2.0" TC

Water #2 – WFI

Drain

≤ 60 gpm @ 20 °C - 80 °C

Instrument Air Steam Supply

10 cfm @ 90 psig

0.5" FNPT 1.0" Flange

450 lbs/hr @ 50 psig

Condensate Return

450 lbs/hr

1.0" Flange

30 Amp @ 460V AC, 3PH, 60 Hz (100A with Electric Heater option)

Electrical Supply

-

CIP Return (CIPR) (Optional)

10-60 gpm @ 30 psig

2.0" TC

U TACTaFlow S45w 45 Description

Requirement

Connection

Water #1 – Purified Water

20 gpm @ 20 psi, 20 °C - 80 °C 20 gpm @ 20 psi, 20 °C - 80 °C

1.0" TC 1.0" TC 2.0" TC

Water #2 – WFI

Drain

≤ 45 gpm @ 20 °C - 80 °C

Instrument Air

10 cfm @ 90 psig

0.5" FNPT

100 Amp @ 460V AC, 3PH, 60 Hz (30A with Steam Heat option)

Electrical Supply

--

NOTE: Operating requirements may vary based on selected options.

Documentation

Standard • Operation and maintenance manuals • Recommended spare parts (RSP) list • Mechanical Bill of Materials (BOM) • Instrumentation calibration procedures • Material Test Reports (MTRs) • W eld maps and weld logs (including qualification and inspection records) • Inspection test results, reports and certificates • Component vendor documentation • As-built General Assembly (GA) drawings • As-built Process and Instrumentation Diagrams (P&ID) • As-built electrical drawings • PLC & HMI code, I/O List

Optional • Functional Specifications (FS) • Configuration Specification (CS) • Factory Acceptance Test (FAT) • Site Acceptance Test (SAT) • Installation and Operation Qualification (IQ/OQ) • Traceability matrix

• Instrument data sheets • Passivation certificate

• Borescope Inspection Video • Hydrostatic test certificate • Riboflavin spray coverage test • Seismic zone anchorage calculations

sanimatic.com

BPB-0008.1