Pharma Multi-Tank TACTaFlow D60 Schematic
TACTaFlow S45 / S60 Schematic
Pharma 1-Tank
CE
FE
CE
FE
CIP Return
CIP Return
TE
TE
PW
CIP Supply
WFI
CIP Supply
Drain
WFI
PW
Drain
Steam
Wash/Rinse
Steam
Wash Solution
Rinse
Air
Air
LE
LE
LE
CE PE
FE
TE
CE PE
FE
TE
Supply Pump
Supply Pump
Chemical Supply
Chemical Supply
Drain
Drain
Condensate Return
Condensate Return
Drain
Drain
NOTE: Illustrative P&ID shown above. S45 uses electric heat as a standard. Design may vary based on selected options.
Operating Requirements
U TACTaFlow S60 / D60 ow 4 Description
Requirement
Connection
Water #1 – Purified Water
20 gpm @ ≤ 40 psi, 20 °C - 80 °C 20 gpm @ ≤ 40 psi, 20 °C - 80 °C
1.5" TC 1.5" TC 2.0" TC
Water #2 – WFI
Drain
≤ 60 gpm @ 20 °C - 80 °C
Instrument Air Steam Supply
10 cfm @ 90 psig
0.5" FNPT 1.0" Flange
450 lbs/hr @ 50 psig
Condensate Return
450 lbs/hr
1.0" Flange
30 Amp @ 460V AC, 3PH, 60 Hz (100A with Electric Heater option)
Electrical Supply
-
CIP Return (CIPR) (Optional)
10-60 gpm @ 30 psig
2.0" TC
U TACTaFlow S45w 45 Description
Requirement
Connection
Water #1 – Purified Water
20 gpm @ 20 psi, 20 °C - 80 °C 20 gpm @ 20 psi, 20 °C - 80 °C
1.0" TC 1.0" TC 2.0" TC
Water #2 – WFI
Drain
≤ 45 gpm @ 20 °C - 80 °C
Instrument Air
10 cfm @ 90 psig
0.5" FNPT
100 Amp @ 460V AC, 3PH, 60 Hz (30A with Steam Heat option)
Electrical Supply
--
NOTE: Operating requirements may vary based on selected options.
Documentation
Standard • Operation and maintenance manuals • Recommended spare parts (RSP) list • Mechanical Bill of Materials (BOM) • Instrumentation calibration procedures • Material Test Reports (MTRs) • W eld maps and weld logs (including qualification and inspection records) • Inspection test results, reports and certificates • Component vendor documentation • As-built General Assembly (GA) drawings • As-built Process and Instrumentation Diagrams (P&ID) • As-built electrical drawings • PLC & HMI code, I/O List
Optional • Functional Specifications (FS) • Configuration Specification (CS) • Factory Acceptance Test (FAT) • Site Acceptance Test (SAT) • Installation and Operation Qualification (IQ/OQ) • Traceability matrix
• Instrument data sheets • Passivation certificate
• Borescope Inspection Video • Hydrostatic test certificate • Riboflavin spray coverage test • Seismic zone anchorage calculations