TD-0001_COP Parts Washers_Technical Datasheet_Rev6.0

CLEAN-OUT-OF-PLACE (COP) PARTS WASHER

8 TESTING The equipment will be factory tested to confirm its proper operation. Included in this are the below testing methods:

• Confirm that the equipment is complete and conforms to the drawings • Confirm that the safety systems operate correctly (if applicable) • Verify controls are wired properly (if applicable) • Functional testing of the control system (if applicable) • Wet testing of the pump

9 DOCUMENTATION

One (1) electronic copy of the documentation package is provided as standard. The documentation is provided in the English language and includes the following information: • Warranty information • Recommended spare parts (RSP) list • Device settings (if different than the vendor’s standard) • Piping & Instrumentation Diagram (P&ID) and Mechanical Bill of Material (BOM) • General Assembly (GA) drawing

• Electrical panel layout drawing (if applicable) • Electrical schematics drawing (if applicable) • Component manuals (as provided by the vendor)

10

CLEAN-OUT-OF-PLACE (COP) PARTS WASHER TECHNICAL DATASHEET